Christian Louboutin refurbishment

The 45 Park Lane building required substantial foundation work, refurbishment Discount Tiffany Watches internal fitout to achieve the required standard of construction, and the contract was awarded to Kier Wallis in August 2008. In the planning stages, The Luxury Watches chose to use the facilities at The Dorchester to provide the building at 45 Park Lane with hot and cold water, power and communications. Following an 'optioneering' exercise Discount A.Lange & Sohne cut works were ruled out due to the substantial disruptions it would cause to the hotel's operations and to the local road network. Discount Alain Silberstein decision was made to provide a service link between the two sites through a tunnel. A route passing under the hotel was considered but rejected because of the risk of damage to finishes. Instead a route along Deanery Street was adopted and discussions started with Thames Water, who maintain a sewer running above the planned line of the tunnel.

Par lfm1001 le vendredi 11 mars 2011

Commentaires

Il n'y a aucun commentaire sur cet article.

Recherche sur NoxBlog

Connexion à NoxBlog.com

Nom d'utilisateur
Mot de passe
Toujours connecté
 

Inscription sur NoxBlog


Adresse du blog
.noxblog.com

Mot de passe

Confirmation

Adresse email valide

Code de sécurité anti-spam

Code anti-bot

J'accepte les conditions d'utilisation de NoxBlog.com